More post-tile updates

After the sealer dried, Anne and I moved the refrigerator back into the kitchen (along a bunch of the other kitchen stuff). The table and chairs are still in the basement pending painting/trim install.

Anne use the circular saw with the finishing blade to cut off the doors (I helped by holding the doors ;-) ). I still need to re-attach the front closet door. In addition to using the painter's tape to help keep the doors from splitting, Anne scored the doors along the cut line with a razor blade. It seemed to work well.

With the doors back in place, the cats have the run of most of the house again (and that makes them happy).

It feels a lot more like home now.

| 4 Comments

4 Comments

How much time/money did the project cost overall?

Which project? (just cutting the doors, or getting the tile installed?)

Just the tile. Or both, whatever.

Tile was about 4k installed.

(Installation runs about $4-$6 per square foot plus material cost, we covered about 550 square feet).

Powered by Movable Type 4.34-en
Creative Commons License
This blog is licensed under a Creative Commons License.